Full Description:

Download availability and pricelist
Avida Towers Makati West
Finally, all you’ve ever wanted.
Avida Towers Makati West is a master planned community of 2 affordable
condominium towers, each having an L-shaped design to allow for optimum views
from each unit. When completed, the project will boast of a modern tropical
ambiance with its lush landscaping.

Avida Towers Makati West
Size of Unit: 20.48-49.98
Price Range: 1.33-5.1M
Site Development Plan

Location and Vicinity

The site is located at the corners of Malugay, Yakal and Lumbayao streets,
which makes it walking distance to some major establishments in Makati. It is
also accessible to offices, shopping malls, schools and churches within the
vicinity of Ortigas and Manila because of the major thoroughfares within the
area. In the immediate vicinity are: Chino Roces Avenue, Pablo Ocampo Street
(formerly Vito Cruz), Buendia Avanue and Ayala Avenue. Ringing the area are:
EDSA, the South Super Highway (SLEX), Taft Avenue and Roxas Boulevard.
Floor Plans and Finishes

Studio Area: Approximately 20 to 25 sqm

1 Bedroom Unit Area: Approximately 33 to 38 sqm

2 Bedroom Unit Area: Approximately 48 to 50 sqm
Finishes
- Painted walls and interior partitions
- Ceramic tiles
- Complete toilet and bath
- Kitchen sink with grease trap
- Tiled countertop with under sink and overhead cabinets
- Flat slab for ceilings
- Expansive windows
Amenities

Swimming pool
Amenities
- Clubhouse
- Swimming pool
- Children’s play area
- Interior landscaping
- Garbage chute
- 24 hour security
- Centralized water supply
- Main lobby
- 2 elevator units
- Adequate emergency power
- Mailbox for each unit
 Clubhouse
Garden Area
Indoor Garden
Progress of Avida Towers Makati West as of December 2007
Project: Towers 1 & 2
Tower 1 has 21 residential floors, while Tower 2 has 19 residential floors.
Avida Towers Makati West has a combined total of 861 residential units, with
21 units per residential floor. The two Towers have a gross floor area of
38,117sqm. All Towers are provided with a three-level podium parking and
common clubhouse and function areas. Building Completion Date:
January 2011 (Towers 1 & 2)
Bored Piling Completion Date: February 22, 2008 (Towers
1 & 2)
Milestones:
Bored piling works (by Trevi Foundation Phils., Inc.) for Tower 1 is
ongoing. Pile dynamic testing was conducted by Dr. Benjamin Buensuceso last
November 30, 2007. Completion of bored piling work for Tower 1 is on the
second week of January 2008.
Monthly Construction Project Updates:
|
Tower 1 |
| November |
Projected |
0% |
| Actual |
0% |
| December |
Projected |
17.00% |
| Actual |
19.55% |
|